Last week the boys got so much done, with no problems we were beginning to think this building gig was easy... until yesterday, Monday morning the beginning of Week 2 of building, Nick and I discovered that we had ordered a couple of items incorrectly, therefore bathroom might be delayed by a week.. or two!
So it turns out the mirror was a wee bit small, both being giants, we have to get a custom made mirror to sit behind to vanity and stretch all the way to the ceiling. And our shower screen (glass panel) is far to big. We ordered a 1000mm, received a 1200mm, which means the walk in access into our new shower would be about ummm.. 400mm - I mean Nick and I are svelte but not that svelte, so I'm now in the process of trying to find a new glass panel to fit this space, again we might have to get one custom made ($$) Yippee! The joys of renovating just gets better.
On a happier note the wall to make the 3rd bedroom went up today, finally we can start seeing and visualising what the "old/ original" part of the house will look like. Chip rockers' will be there until the end of the week and then... let the tiling begin!
Old Living/ Dining now 3rd Bedroom
Taken from inside room, plaster to come
Looking down the hallway -
Master bedroom & Family Bathroom on right, Bedroom 2 & Bedroom 3 on left
The floor is down on the Master ensuite.
Above door going into Master ensuite - Getting ready for hanging/ sliding door